On the same roll as the previous post (Kodak Gold) Direct scan from the negative and converted into B&W using 'PS'
1. The Causey Arch which at one time was the widest single span stone arch bridge in the world Built in 1725 as a way of getting horse drawn coal wagons over the Causey Gorge, and onto the ships on the Tyne some 8 miles away. 80 feet above the burn at the bottom and about 95 feet from between the buttresses. This bridge was built without the usual 'keystone' in the middle of the arch, locking all the masonry together. It ceased use as a wagonway after about 30 years but still remain as a footpath and is a grade 1 listed building.
2. Its a long way down!
3. Further down the gorge were these two obviously dead trees standing in a clearing below the Causey Incline carrying the Tanfield railway today. Man made to provide infill to a wide gap (about 300 feet) and around 90 feet high, all done by manpower assisted by a few horses and shovels. This also crossed the burn about 300 yds down from the arch but this time they built a stone lined culvert and filled in the remaining gap. The culvert is still working as well as it did when it was built
1. The Causey Arch which at one time was the widest single span stone arch bridge in the world Built in 1725 as a way of getting horse drawn coal wagons over the Causey Gorge, and onto the ships on the Tyne some 8 miles away. 80 feet above the burn at the bottom and about 95 feet from between the buttresses. This bridge was built without the usual 'keystone' in the middle of the arch, locking all the masonry together. It ceased use as a wagonway after about 30 years but still remain as a footpath and is a grade 1 listed building.
2. Its a long way down!
3. Further down the gorge were these two obviously dead trees standing in a clearing below the Causey Incline carrying the Tanfield railway today. Man made to provide infill to a wide gap (about 300 feet) and around 90 feet high, all done by manpower assisted by a few horses and shovels. This also crossed the burn about 300 yds down from the arch but this time they built a stone lined culvert and filled in the remaining gap. The culvert is still working as well as it did when it was built